A Thoughtful Full-Roof Renewal for a Two-Storey Home in Scugog
Replaced an aging roof on a two-storey home with high attention to detailing, ventilation and durable finishes.

- 1
Detailed survey and specification
We began with a comprehensive on-site survey noting roof pitch, valley types (closed vs. open), and the condition of eavestrough connections. From that assessment we specified a full tear-off, synthetic underlayment, ice-and-water shield at eaves and valleys, and architectural laminate shingles for enhanced durability.
- 2
Controlled tear-off and deck repairs
The crew performed a complete tear-off down to the roof sheathing, disposing of old materials in approved local facilities. Where sheathing was compromised—mostly in valley junctions and around plumbing stacks—we sistered 19 mm plywood to bring the deck back to code-approved thickness and fastener spacing.
- 3
Underlayment, ice protection and flashing
We installed a high-temperature synthetic underlayment across the field for superior tear resistance and a self-adhering ice-and-water membrane along the eaves and through the lower roof planes. All step flashings, counter-flashings and the chimney cricket were replaced in lead-free metal, sealed and integrated to current best practices and Ontario building code considerations.
- 4
Premium shingle installation and ventilation upgrade
Selected architectural laminated shingles (class 3+ impact-rated where requested) were applied with ring-shank nails at specified exposures and nailing patterns. We upgraded the attic ventilation by balancing intake soffit vents with a ridge vent to reduce moisture buildup and improve energy performance.
- 5
Finishing details and site cleanup
Ridge caps were installed using matching shingles cut to profile and secured with corrosion-resistant fasteners; eavestrough outlets were re-sealed and metal drip edge installed. A final inspection, magnetic sweep of the property and a staged debris pick-up ensured the site met our tidy, respectful standard for Scugog homeowners.
Frequently Asked Questions
How long does a full roof replacement like this typically take?
For a two-storey home of this scale we usually complete a full tear-off and re-roof in two to five working days, weather permitting. Scheduling considers local seasonal patterns in Scugog to avoid prolonged exposure of the deck during wet or freezing conditions.
Will a roof replacement be disruptive to the household?
We aim to minimise disruption: crews work daytime hours, set up debris containment and protect exterior finishes and landscaping. There is some noise during tear-off and installation, but we leave the property clean each day and email a job-plan so homeowners know what to expect.
How do I know if my roof needs a full replacement instead of repairs?
Indicators for full replacement include widespread shingle granule loss, multiple active leaks, collapsed flashings, and pervasive rot in the decking. A professional inspection in Scugog will assess these conditions and recommend a repair or full replacement based on longevity and cost-effectiveness.
What maintenance keeps this new roof performing well?
Simple seasonal care—keeping gutters clear, trimming overhanging branches, and checking attic ventilation—goes a long way. We provide a short maintenance checklist and remain available by email to advise on any observations the homeowner reports.
